Cabinet approves 6-lane greenfield Nashik- Solapur-Akkalkot Corridor in Maharashtra
31st December 2025
The Cabinet Committee on Economic Affairs has approved the Construction of 6-lane greenfield access-controlled Nashik- Solapur-Akkalkot Corridor in the State of Maharashtra on BOT (Toll) Mode with project length of 374 km with a total Capital Cost of Rs.19,142 crore
This project will provide connectivity to important regional cities such as Nashik, Ahilyanagar, Solapur connecting to Kurnool, as indicated in the map. This infrastructure is a significant step to facilitate integrated transport infrastructure development under the PM Gatishakti National Master Plan principle
The greenfield corridor from Nashik to Akkalkot is proposed to be connected to Delhi-Mumbai Expressway near Vadhawan port interchange, Agra-Mumbai corridor at Nashik at junction with NH-60 (Adegaon) and Samruddhi Mahamarg at Pangri (near Nashik)
The proposed corridor will provide through connectivity from west coast to east coast
From Chennai port end, 4-lane corridors are already in progress from Chennai to Hasapur (MH Border) via Thiruvallur, Renigunta, Kadappa and Kurnool (700 km long)
The primary purpose of the proposed access-controlled six-lane greenfield project corridor is to improve travel efficiency and is expected to reduce travel time by 17 hours and reduce the travel distance by 201 km
Nashik – Akkalkot (Solapur) connectivity will improve logistics efficiency for freight originating and terminating at major National Industrial Corridor Development Corporation (NICDC) nodes of Kopparthy and Orvakal
Nashik – Talegaon Dighe part of the section also addresses the requirement for development of Pune-Nashik Expressway, as identified by NICDC as a part of proposed new Expressway being taken up by the State Government of Maharashtra
The project provides high speed corridor designed for improved safety and uninterrupted traffic movement, reducing travel time, congestion, and operating costs. Importantly, the project will enhance the basic infrastructure in the region, contributing to the overall economic development of Nashik, Ahilyanagar, Dharashiv, and Solapur districts
The 6-lane access-controlled greenfield corridor with close tolling, supporting average vehicular speeds of 60 km/h with design speed of 100 km/h. This will reduce the overall travel time to approximately 17 hours (Reduce by 45% from 31 hours), while offering safer, faster, and uninterrupted connectivity for both passenger and freight vehicles
The project will generate about 251.06 lakh man-days of direct employment and 313.83 lakh man-days of indirect employment. The project will also induce additional employment opportunities due to increase in economic activity in the vicinity of the proposed corridor
Project Alignment Map for Nashik-Ahmednagar-Solapur-Akkalkot

