Latest Peak Demand (2026-07-10): 14501 MW
1 day prior (2026-07-09): 13713 MW (-5.4% vs Latest)
1 week prior (2026-07-03): 12612 MW (-13% vs Latest)
4 weeks prior (2026-06-12): 12025 MW (-17.1% vs Latest)
52 weeks prior (2025-07-04): 12144 MW (-16.3% vs Latest)
During the past 365 days ending on 2026-07-10, the Minimum Peak Demand was 8203 MW, Maximum Peak Demand was 18548 MW, and Average Peak Demand was 13309 MW